Versions Compared
Version | Old Version 5 | New Version Current |
---|---|---|
Changes made by | ||
Saved on |
Key
- This line was added.
- This line was removed.
- Formatting was changed.
These are steps to generate a list of students who are pending enrollment and then processed for EC Coalition services. This process is based on user permissions.
Step-by-step
Click Reports on the main menu options
Select Process Reports from the File Menu
Image Modified
In the Pending reports section, choose Load the appropriate EC Coalition Report
The following is a sample report of the reports that will generate
Image Modified
Select Processed on the student row after the Initial Joint Review/Consent event for the student has been created in Phoenix
Go to Load> (choose the appropriate EC Coalition report) in the Group: Processed reports section
Image Modified
The report generates and the student appears on the report
Image Modified
Related articles
Page Contents
Table of Contents | ||||||
---|---|---|---|---|---|---|
|